Are you able to guess answers of OPS 571 Week 4 Quiz very easily without having any confusion in your mind? If the answer is no then you have reached to the right online learning portal that helps its students to answers all the questions quickly and easily. Uop E Tutors has always tried to make study material as easy as possible.
OPS 571 Week 4 Quiz

OPS 571 Week 4 Quiz

$8.99 - $11.99
Rating: A+ Purchased: 29 Times

OPS 571 Week 4 Quiz -

1. A work breakdown structure is

  • a hierarchy of tasks, subtasks, and work packages
  • a Cost and Performance tracking schedule
  • a structure that is incompatible with the Critical Path Method
  • a simple list of the activities making up a project

2. The vertical axis on a Gantt chart is usually which of the following?

  • Activities
  • Time
  • Cost
  • Profit

3. Which of the following identifies a key principle of Reengineering?

  • Organize around tasks.
  • Downsize (layoff) workers and do the same amount of work as before.
  • Merge information processing work into the real work that produces the information.
  • Capture information both at the source and where it is interpreted.

4. At the onset, a project originates as which of the following?

  • A Gantt chart
  • A series of milestones
  • Critical path method (CPM)
  • A statement of work (SOW

5. Consulting firms typically use which of the following techniques to plan and monitor the engagements of the firm or specific projects?

  • CPM/PERT
  • Qualitative forecasting
  • Materials requirements planning (MRP)
  • Quantitative layout

6. A Responsibility Chart specifically identifies which of the following?

  • Planning the tasks for a project
  • Customer satisfaction
  • Commitment to quality
  • Level of inventory

7. Which of the following would be the result of subdividing a project?

  • Job orders
  • Work events
  • Job categories
  • Tasks

8. Which project progress technique includes the essential features of a project plan, budgeted cost of work scheduled and budgeted cost of work performed?

  • Earned value management
  • Critical path method
  • Cost analysis
  • Gantt chart

9. An example of a graphic project report utilized within project management is:

  • Project proposal
  • Equipment and supplies chart
  • Humphrey chart
  • Cost and performance tracking schedule